"C","Morning Report" "C","Report for 7/4/2008" "C","Report Generated 07/04/2008 11:30:18 GMT" "H","DESCRIPTION" "H","" "G","Report Type" "D","Morning Report" "H","DATE","TIME" "H","","" "G","1. Report Date" "D","Friday, Jul 4 2008","07:30:18 EDT" "H","DESCRIPTION","VALUE" "H","","(MW)" "G","2. Peak Load" "D","Thursday, Jul 3 2008 hour ending 16",21018 "G","3. Operable Capacity Analysis" "D","A. Installed Generating Capacity",30772 "D","B.Capacity Additions EcoMax Bid > SCC",732 "D","C. Pre-OP4 Dispatchable Loads",0 "D","D. Generation Outages and Reductions",2816 "D","E. Uncommitted Available Generation (non fast start)",9310 "G","F. Capacity Deliveries: Net Purchases = (-) Net Sales = (+)" "D","NYISO AC Ties",-369 "D","NYISO Cross Sound Cable",330 "D","NB",-353 "D","TransEnergie",-1618 "D","Net Deliveries",-2010 "D","G. Total Available Capacity (A+B+C-D-E-F)",21388 "D","H. Peak Load Forecast For Hour 14",17020 "D","I. Total Operating Reserve Requirement",2100 "D","J. Capacity Required",19120 "D","K. Surplus = (+) Deficiency = (-) (G - J)",2268 "D","L. Replacement Reserve Requirement",0 "D","M. Excess Commitment Surplus = (+) Deficiency = (-) (K - L)",2268 "G","4. Largest First Contingency" "D","MYS8&9",1400 "G","5. Annual Maintenance Schedule (A.M.S)" "D","Peak Load Exposure",27970 "G","6. Reserve Summary" "D","Ten Minute Reserve Requirement:",1400 "D","Ten Minute Reserve Estimate:",1400 "D","Thirty Minute Reserve Requirement:",700 "D","Thirty Minute Reserve Estimate:",2968 "D","Expected ICU Operation","0" "D","Expected Actions of OP 4:","0" "D","Additional Capacity Available from OP 4 Actions:","0" "H","DESCRIPTION","TRANSFER LIMIT","SCHEDULED CONTRACT" "H","(MW)","(MW)" "G","7. Interchange Summary" "D","NYISO AC Ties",-1000,-378 "D","NYISO Cross Sound Cable",330,330 "D","NB",-700,-53 "D","TransEnergie",-2218,-1712 "H","CITY","CONDITIONS","WIND","HIGH TEMP" "H","","","","(F)" "G","8. Weather Forecast Summary for the Peak Hour" "D","Boston","THUNDER SHOWERS","NE-6",71 "D","Hartford","PARTLY CLOUDY","NE-4",80 "H","DESCRIPTION","VALUE" "H","","" "G","9. SAR Available" "D","NYISO","Yes" "H","DESCRIPTION","VALUE" "H","","(MW)" "G","10. Capacity of Non-Commercial Units" "D","Total Available",0 "G","11. Units Committed to Meet Minimum Operating Reserve and Replacement Reserve Requirements" "D","0 Units",0 "H","DESCRIPTION","VALUE" "H","","" "G","12. Solar Magnetic Disturbance Activity" "D","Forecast:","" "D","Alert:","" "D","Intensity:","" "D","Observed Activity:","" "D","Actions Taken or Planned by ISO-NE:","" "D","Actions Taken or Planned by Other Control Areas:","" "T","44 Lines"