AC - alternating current

ACE - Area Control Error

AGC - Automatic Generator Control

ARA - Annual Reconfiguration Auction

ARD - Asset Related Demand

ARR - Auction Revenue Right

Appendix H - Appendix H of Market Rule 1, Operations during Cold Weather Conditions

ASM - Ancillary Services Market

BA - Balancing Authority

BACT - best available control technology

BCC - backup control center

C&LM - conservation and load management

CA - Control Area

CAA - U.S. Clean Air Act

CAGR - compound annual growth rate

CAIR - Clean Air Interstate Rule

CAMS - Customer and Asset Management System

CARL - Control Area Reliability

CC - Combined Cycle (generator)

CCP - Capacity Commitment Period

CEII - Critical Energy Infrastructure Information

CELT Report - Forecast Report of Capacity, Energy, Loads, and Transmission

CFR - Code of Federal Regulations

CIP - Critical Infrastructure Protection

CONE - Cost of New Entry

COP - Current Operating Plan

COS - cost of service

CP - Clearing Price

CPI - Consumer Price Index

CPS - Control Performance Standard

CPS - Critical Path Standard

CT - Combustion Turbine (generator) or Connecticut Load Zone

CTR - Capacity Transfer Rights

DA - Day-Ahead (prior to the operating day)

DAALO - Day-Ahead Adjusted Load Obligation

DAANI - Day-Ahead Adjusted Net Interchange

DAGO - Day-Ahead Generation Obligation

DALO - Day-Ahead Load Obligation

DALRP - Day-Ahead Load Response Program

DAM - Day-Ahead Energy Market

DARD - dispatchable asset-related demand

DC (see HVDC) - direct current

DCF - Discounted Cash Flow

DCS - Disturbance Control Standard

DDP - Desired Dispatch Point

DEC's - Decrement Bid

DG - distributed generation

DOE - Department of Energy

DRP - demand-response provider

DRR Pilot - Demand-Response Reserve Pilot Program

DSM - demand-side management

EBB - electronic bulletin board

EcoMax - Economic Maximum

EcoMin - Economic Minimum

ECP - energy clearing price

ED - Economic Dispatch

EES - Enhanced Energy Scheduler

EFOR - equivalent forced-outage rate

EFORd - Demand Estimated Forced Outage Rate

EHV - extra-high voltage

EIS - Environmental Impact Statement

EMF - electromagnetic field

eMkt - Software application used to submit Offers and Bids into the ISO Market

EMS - Energy Management System

EP - Enrolling Participant

EPAct - Energy Policy Act of 2005

ERO - Electric Reliability Organization

ET - External Transactions

FACTS - flexible alternating-current transmission system

FAM - Financial Assurance Management

FAQ - Frequently Asked Question

FAP - Financial Assurance Policy

FCA - Forward Capacity Auction

FCM - Forward Capacity Market

FCTS - Forward Capacity Tracking System

FERC - Federal Energy Regulatory Commission

FPA - Federal Power Act

FRM - Forward Reserve Market

FTR - Financial Transmission Right

FRM - Forward Reserve Market

GADS - Generating Availability Data System

GIS - gas-insulated substation, gas-insulated switchgear, Generation Information System, Geographic Information System

GRT - Generation Requirements for Transmission Constraints

HQICC - Hydro Quebec Interconnection Capability Credits

hp - horsepower

HVDC - high-voltage direct current

IA - interconnection agreement

IBCS - Internet Based Communication System

IBL - Internal Bilateral for Load

IBM - Internal Bilateral for Market

IBT - Internal Bilateral Transaction

ICAP - Installed Capacity

ICR - Installed Capacity Requirement

ICU - Internal Combustion Unit (generator)

IGCC - integrated coal-gasification combined cycle

IMO - Independent Electricity Market Operator (Ontario)

INC's - Increment Bid

IPP - independent power producer

IROL - interconnection-reliability operating limit

IRH - Interconnection Rights Holders

ISO - Independent System Operator, ISO New England Inc.

LCC - local control center

LDC - local distribution company

LICAP - Locational Installed Capability

LMP - Locational Marginal Pricing

LNS - local network service

LOLE - loss-of-load expectation

LOS - loss of source

LPG - liquefied petroleum gas

LRP - load-response program

LSC - Local Second Contingency

LSCPR - Local Second Contingency Protection Resource

LSE - Load Serving Entity

LTTR - Long-term Transmission Right

MAIN - Mid-America Interconnected Network

MC - Markets Committee

ME - Maine Load Zone

MIS - Market Information Server

MOU - Memorandum of Understanding

MPSA - Market Participant Service Agreement

MR1 - Market Rule 1 (Section III of the Transmission, Markets & Services Tariff)

MRR - Manual Response Rate

MSS - Market Support Services

MSW - municipal solid waste

MUI -market user interface

muni - municipal utility

MW - Megawatt

MWh - Megawatt Hour

N-1 - first-contingency loss

N-2 - second-contingency loss

NAAQS - National Ambient Air Quality Standards

NB - New Brunswick

NCPC - Net Commitment Period Compensation

NECPUC - New England Conference of Public Utility Commissioners

NEL - net energy for load

NEMA/Boston - Northeastern Massachusetts/Boston load zone

NEPOOL - New England Power Pool

NERC - North American Electric Reliability Council

NESCOE - New England States Committee on Electricity

NH - New Hampshire Load Zone

NIETC - National Interest Electric Transmission Corridor

NOPR - Notice of Proposed Rulemaking

NPCC - Northeast Power Coordinating Council, Inc.

NRI - Northeast Reliability Interconnection

NYISO - New York Independent System Operator

O&M - operations and maintenance

OASIS - Open Access Same-Time Information System

OATT - Open Access Transmission Tariff

ODR - Other Demand Resource

OOM - Out-of-Merit

OP - operating procedure

OP 4 - ISO Operating Procedure No. 4, Action during a Capacity Deficiency

OP 8 - ISO Operating Procedure No. 8, Operating Reserve and Regulation

OP 17 - ISO Operating Procedure No. 17, Load Power Factor Correction

OP 19 - ISO Operating Procedure No. 19, Transmission Operations

OP 21 - ISO Operating Procedure No. 21, Actions during an Energy Emergency

OR - Operating Reserve

PA - Planning Authority

PAR - phase-angle regulator; phase-angle regulating transformer

PER - Peak Energy Rent

pnode - pricing node

POLR - provider of last resort

PPA - Power Purchase Agreement

PTDF - Power Transfer Distribution Factor

PTF - Pool Transmission Facility

PTO - Participating Transmission Owners

PTOAC - Participating Transmission Owners Administrative Committee

PUC - Public Utility Commission

PUCHA - Public Utility Holding Company Act

PURPA - Public Utility Regulatory Policies Act

PV - solar photovoltaic

QUA - Qualified Upgrade Awards

RAA - Reserve Adequacy Analysis, Resource Adequacy Assessment

RBA - Requested Billing Adjustment

RC - Reliability Committee, reliability coordinator

RCP - Regulation Clearing Price

RCPF - Reserve Constraint Penalty Factor

REC - Renewable Energy Certificate, Renewable Energy Credit

RFP - Request for Proposals

RGGI - Regional Greenhouse Gas Initiative

RI - Rhode Island Load Zone

RIG - Remote Intelligent Gateway

RMCP - Reserve Market Clearing Price

RMR - Reliability Must Run

RNA - Restated NEPOOL Agreement

RNS - Regional Network Service

ROE - Return On Equity

ROS - Rest of System

ROW - right of way

RP - resource planner

RPS - Renewable Portfolio Standard

RRA - Resource Reliability Assessment

RSC - Resource Scheduling and Commitment

RSG - Reserve Sharing Group

RSP - Regional System Plan

RT - Real-Time

RTANI - Real-Time Adjusted Net Interchange

RTANID - Real-Time Adjusted Net Interchange Deviation

RTALO - Real-Time Adjusted Load Obligation

RTGO - Real-Time Generation Obligation

RTLO - Real-Time Load Obligation

RTM - Real-Time Energy Market

RTMP - real-time marginal price

RTO - Regional Transmission Organization

SAS70 - Statement on Auditing Standards No. 70

SCADA - System Control and Data Acquisition

SCC - Seasonal Claimed Capability

SCR - Special Constrained Resources

SEMA - South East Massachusetts Load Zone

SIP - state implementation plan

SIS - System Impact Study

SMD - Standard Market Design

SME - subject matter expert

SMS - Settlement Market System

SOG - settlement-only generator

SOI - show of interest

SOL - system operating limit

SPD - scheduling, pricing, and dispatching

SPS - special protection system

SS - Self-scheduled

STATCOM - static synchronous compensator

SVC - static VAR compensator

SVD - static VAR device

SWCT - Southwest Area of the Connecticut Load Zone

TADO - Total Amount Due and Owing

TCA - Transmission Cost Allocation

TMNSR - Ten-Minute Non-Spinning Reserve

TMOR - Thirty-Minute Operating Reserve

TMSR - Ten-Minute Spinning Reserve

TO - Transmission Owner

TOA - Transmission Operating Agreement

PAC - Planning Advisory Committee

TP - transmission planner

TRAGO - Transmission Related Abnormal Generation

TSA - Transmission Service Agreement or Transmission Security Analysis

TSO - Tariffs, Schedules, and OASIS

TTC - Total Transfer Capacity

UDG - Unit Desired Generation

UDS - Unit Dispatch System

UI - User Interface

VAR - Voltage Amperes Reactive

VOC - volatile organic compound

VT - Vermont Load Zone

WCMA - West Central Massachusetts Load Zone

WEM - Wholesale Electric Market

WSCC - winter seasonal claimed capability

Load Zones

VT - Vermont Load Zone

ME - Maine Load Zone

NH - New Hampshire Load Zone

WCMA - West Central Massachusetts Load Zone

SEMA - South East Massachusetts Load Zone

CT - Connecticut Load Zone

RI - Rhode Island Load Zone

NEMA - North East Massachusetts and Boston Load Zone