Hub Nodes:
NORTHFLD 345
LUDLOW 345
CARPTRHL 345
SANDY_PD 345
MILLBURY 345
PRAT_J 230
LUDLOW 115
PALMER 115
W_CHRLTN 115
CARPTRHL 115
N_OXFORD 115
WBSTR_ST 115
BARRE 115
BLOMNGDL 115
NASHUA 115
GREENDAL 115
ROLF_AVE 115
W_BOYLST 115
WACHUS 115
PRAT_J 115
WENDLDPT 115
WYMNGRDN 115
VERNONHL 115
E_MAIN_S 115
NRTHBORO 115
PAXTON 115
STERLING
AYER 115
SANDY_PD 115
MILLBURY 115
THORNDIK 115
LITTLRST 115
Corrected 3/15/02)
The System Operator shall calculate Nodal Prices for an hour for the Day-Ahead Market or the Real-Time Market at a given Node i using the following formula, or a formula similar in substance and effect:
where:
the Nodal Price at Node i in $/megawatthour;
the marginal cost in $/megawatthour, based on Demand Bids and Supply Offers, to serve additional load at the Reference Node;
the Marginal Loss Component of the Nodal Price at Node i in $/megawatthour; and
the Congestion Component of the Nodal Price at Node i in $/megawatthour.
The Marginal Loss Component of the Nodal Price at any Node i on the NEPOOL Transmission System is calculated using the equation
in which WFi, the Withdrawal Factor at Node i relative to the system Reference Node, is calculated using the following equation:
where:
L = NEPOOL Transmission System losses;
Pi = the net amount of Energy injected into the NEPOOL Transmission System at Node i; and
= the ratio of: (1) the amount by which NEPOOL Transmission System losses occurring in the Day-Ahead Schedule or Real-Time dispatch would have increased, as calculated by the System Operators Day-Ahead or Real-Time computer algorithm, if a very small additional amount of Energy had been injected at Node i (in addition to the injections and withdrawals already scheduled to occur on the NEPOOL Transmission System in the Day-Ahead schedule or occurring on the NEPOOL Transmission System in the Real-Time dispatch), to (2) the size of the additional injection of Energy at Node i.