INFORMATIONAL ONLY - FUTURE FCM Procedures
Pending FCM Procedures, intended to go into effect with the Forward Capacity Market; not to be used for current operations. Provided as information for future operation. This page will be retired once the FCM Procedures have transitioned into production procedures.
| Date |
Document Title |
Document Type |
| Oct 08, 2009 |
Technical Requirements for Generators, Demand Resources & Asset Related Demands |
 |
PDF (307k) |
| Oct 08, 2009 |
For New & Upgraded Metering, Recording, and Telemetering Installations and for Calibrating of Existing Equipment |
 |
PDF (73.5k) |
| Oct 08, 2009 |
|
 |
PDF (600k) |
| Oct 08, 2009 |
Metering & Telemetering Criteria |
 |
PDF (247k) |
| Oct 08, 2009 |
|
 |
PDF (41.4k) |
| Oct 08, 2009 |
Transmission Operations |
 |
PDF (91.2k) |
| Oct 08, 2009 |
Action During an Energy Emergency |
 |
PDF (106k) |
| Oct 08, 2009 |
Generation and Load Relief..... |
 |
PDF (35.2k) |
| Oct 08, 2009 |
Action During a Capacity Deficiency |
 |
PDF (55.9k) |
| Oct 08, 2009 |
Operating Reserve & Regulation |
 |
PDF (147k) |
| Oct 08, 2009 |
Scheduling & Dispatch of External Transactions |
 |
PDF (219k) |