Compliance Interpretations
Includes Compliance Aids intended to Assist Market Participants in their Compliance Obligations with Respect to NERC Reliability Standards.
Date Document Title Document Type
Jan 08, 2010
Acceptable Corroborating Evidence: "Determination of Inclusion in the Metered Boundaries of ISO-NE for Generator Operators, Transmission Operators and Load-Serving Entities Operating in the Balancing Authority's Area."
PDF (221k)
Jan 08, 2010
Acceptable Corroborating Evidence: "Deficient Load-Serving Entities Are Not Required to Request the Reliability Coordinator to Initate an Energy Emergency Alert in New England."
PDF (207k)
Jan 08, 2010
Acceptable Corroborating Evidence: "All New England Customers Must Purchase Schedule 2 'Reactive Supply and Voltage Control from Generation Source Service', per ISO-NE Tariff, II.4."
PDF (86.2k)
Jan 08, 2010
Acceptable Corroborating Evidence: "Standards Pertaining to Dynamic Scheduling Do Not Apply in New England at This Time"
PDF (206k)
Jan 08, 2010
Acceptable Corroborating Evidence: "Reliability Directives Issued by the Reliability Coordinator Are Not Applicable to Load-Serving Entities, Purchasing-Selling Entities or Transmission Service Providers in New England."
PDF (210k)
Jan 08, 2010
Acceptable Corroborating Evidence: "Standards Pertaining to Under Voltage Load Shedding Programs Do Not Apply in New England at This Time"
PDF (207k)
  Copyright ©2010 ISO New England Inc.