| Aug 12, 2010 |
Acceptable Corroborating Evidence: "Standards pertaining to Operating within the most Limiting Parameter" |
 |
DOC (48.5k) |
| Jun 10, 2010 |
Acceptable Corroborating Evidence: "Standards Pertaining to Compliance with Directives and/or Reliability Directives issued by their RC or TOP" |
 |
DOC (103k) |
| Jun 08, 2010 |
Acceptable Corroborating Evidence: "Standards Pertaining to Loss of Control Center Functionality" |
 |
DOC (45.5k) |
| Jun 08, 2010 |
Acceptable Corroborating Evidence: "Standards Pertaining to Under Frequency Load Shedding (UFLS) Programs" |
 |
DOC (46k) |
| Jun 08, 2010 |
Acceptable Corroborating Evidence: "Standards Pertaining to Assessments for Interconnecting New Facilities" |
 |
DOC (49k) |
| Jun 08, 2010 |
INT-001-3, R1 & 1.1, INT-004-2, R2, 2.1, 2.2, 2.3, IRO-001-1, R8, IRO-005-3, R10, TOP-005-1, R4, VAR-001-1, R5; Acceptable Corroborating Evidence: "Standards Pertaining to Purchasing-Selling Entity functions in New England" |
 |
DOC (102k) |
| Jun 08, 2010 |
Acceptable Corroborating Evidence: "Standards pertaining to Rendering Emergency Assistance" |
 |
DOC (46.5k) |
| Apr 15, 2010 |
Acceptable Corroborating Evidence"Determinants for Assessing Compliance with FAC-008-1, Facility Ratings Methodology and FAC-009-1, Establish and Communicate Facility Ratings When Auditing TOs and GOs operating within the New England Balancing Area." |
 |
PDF (248k) |
| Apr 15, 2010 |
Acceptable Corroborating Evidence: "ISO-NE provides email notification to NPCC/Auditors if an entity does not provide Generator Step Up and Auxiliary Transformer information to ISO-NE within 30 calendar days of a request for such data." |
 |
PDF (212k) |
| Jan 08, 2010 |
Acceptable Corroborating Evidence: "Reliability Directives Issued by the Reliability Coordinator Are Not Applicable to Load-Serving Entities, Purchasing-Selling Entities or Transmission Service Providers in New England." |
 |
PDF (210k) |
| Jan 08, 2010 |
Acceptable Corroborating Evidence: "Deficient Load-Serving Entities Are Not Required to Request the Reliability Coordinator to Initate an Energy Emergency Alert in New England." |
 |
PDF (207k) |
| Jan 08, 2010 |
Acceptable Corroborating Evidence: "Standards Pertaining to Under Voltage Load Shedding Programs Do Not Apply in New England at This Time" |
 |
PDF (207k) |
| Jan 08, 2010 |
Acceptable Corroborating Evidence: "Determination of Inclusion in the Metered Boundaries of ISO-NE for Generator Operators, Transmission Operators and Load-Serving Entities Operating in the Balancing Authority's Area." |
 |
PDF (221k) |
| Jan 08, 2010 |
Acceptable Corroborating Evidence: "Standards Pertaining to Dynamic Scheduling Do Not Apply in New England at This Time" |
 |
PDF (206k) |
| Jan 08, 2010 |
Acceptable Corroborating Evidence: "All New England Customers Must Purchase Schedule 2 'Reactive Supply and Voltage Control from Generation Source Service', per ISO-NE Tariff, II.4." |
 |
PDF (86.2k) |