ISO New England Planning Procedures
As the Regional Transmission Organization (RTO), ISO-NE is responsible for transmission planning and sets requirements for participants regarding reliability standards, pooled transmission facility cost review and notice of intent to change facilities.
Date Document Title Document Type
Oct 13, 2006
Reliability Standards for the New England Area Bulk Power Supply System
DOC (101k)
Jan 08, 2007
Procedure for Pool-Supported PTF Cost Review
DOC (165k)
Feb 01, 2005
Cost Responsibility for Transmission Upgrades with Multiple Needs
DOC (49.5k)
Feb 01, 2005
Procedure for Reporting Notice of Intent to Construct, Retire or Change Facilities in Accordance with Section I.3.9 of the ISO New England Tariff (Proposed Plan Application Procedure)
DOC (41k)
Feb 04, 2008
Procedure for Review of Governance Participant's Proposed Plans (Section I.3.9 Applications: Requirements, Procedures and Forms)
DOC (376k)
Feb 01, 2005
Guidelines for Conducting and Evaluating Proposed Plan Application Analysis
DOC (152k)
Feb 01, 2005
Subordinate Proposed Plan Application Policy
DOC (44.5k)
Apr 13, 2007
Special Protection Systems Application Guidelines
DOC (75k)
Feb 01, 2005
Scope of Study for System Impact Studies Under the Minimum Interconnection Standard
DOC (54k)
Feb 14, 2007
Procedures for Determining and Implementing Transmission Facility Ratings in New England
PDF (612k)
Apr 14, 2006
Ambient Temperatures and Wind Velocity for Rating Calculations
PDF (102k)
Apr 14, 2006
Analysis of Wind-Temperature Data and Effect on Current-Carrying Capacity of Overhead Conductors
PDF (952k)
Apr 14, 2006
Old Capacity Ratings Procedures
PDF (294k)
Feb 01, 2005
Construction Sequencing
DOC (56.5k)
May 15, 2008
Planning Procedure to Support the Forward Capacity Market
PDF (472k)