ISO-NE periodically conducts analyses and publishes reports on events and issues relating to the wholesale electricity markets and the bulk electric power system. Reports for this year include the August Blackout Report, Cold Snap Reports and Patton Reports.
| Date |
Document Title |
Document Type |
|
| Jun 01, 2005 |
Report by David B. Patton, Ph.D. and Pallas LeeVanSchaick, Independent Market Monitoring Unit, ISO New England Inc. |
 |
PDF (716k) |
|
| Aug 16, 2004 |
Middletown-Norwalk Project steering committee process. |
 |
PDF (1.0Mb) |
|
| Aug 16, 2004 |
Connecticut Cable Resonance study for XLPE alternative in Middletown to Norwalk Project. |
 |
PDF (2.1Mb) |
|
| Aug 16, 2004 |
Connecticut Cable Resonance study for dual DC option in Middletown to Norwalk Project. |
 |
PDF (1.2Mb) |
|
| Aug 16, 2004 |
Connecticut Cable Resonance study for Synchronous Condenser option 2 in Middletown to Norwalk Project. |
 |
PDF (1.5Mb) |
|
| Aug 16, 2004 |
Analysis cites alternative configuration as marginally acceptable for upgrade to Southwest Connecticut's system. |
 |
PDF (300k) |
|
| Aug 30, 2004 |
Similar to Those Experienced During the January 14-16, 2004 Cold Snap Period - Letter from Mr. Richard J. Dominguez, Market Monitoring, ISO New England Inc. |
 |
PDF (306k) |
|
| Mar 24, 2004 |
Post Operational Assessment of New England's Interstate Pipeline Delivery Capability During the January 2004 Cold Snap - Report prepared by Levitan & Associates, Inc. |
 |
PDF (586k) |
|
| Oct 12, 2004 |
During the January 14-16, 2004 Cold Snap - Report prepared by ISO New England Inc., Market Monitoring Department |
 |
PDF (3.3Mb) |
|
| May 10, 2004 |
During the January 14-16, 2004 Cold Snap - Report prepared by ISO New England Inc., Market Monitoring Department |
 |
PDF (1.2Mb) |
|
| Oct 12, 2004 |
ISO New England's Management Response to the October 12, 2004 publication entitled Final Report on Electricity Supply Conditions in New England during the January 14 - 16, 2004 Cold Snap |
 |
PDF (582k) |
|
| Aug 16, 2004 |
The Connecticut Light and Power Company and The United Illuminating Company and ISO-NE formed a Reliability and Operating Committee. |
 |
PDF (1.3Mb) |
|
| Dec 21, 2004 |
|
 |
PDF (258k) |
|
| Nov 01, 2004 |
Report prepared by ISO New England Inc., Market Monitoring Department |
 |
PDF (214k) |
|
| Feb 01, 2004 |
Performance of the New England and Maritimes Power Systems During the August 14, 2003 Blackout |
 |
PDF (676k) |
|