Special Reports
2004
ISO-NE periodically conducts analyses and publishes reports on events and issues relating to the wholesale electricity markets and the bulk electric power system. Reports for this year include the August Blackout Report, Cold Snap Reports and Patton Reports.

Date Document Title Document Type
Jun 01, 2005
Report by David B. Patton, Ph.D. and Pallas LeeVanSchaick, Independent Market Monitoring Unit, ISO New England Inc.
PDF (716k)
Aug 16, 2004
Middletown-Norwalk Project steering committee process.
PDF (1.0Mb)
Aug 16, 2004
Connecticut Cable Resonance study for XLPE alternative in Middletown to Norwalk Project.
PDF (2.1Mb)
Aug 16, 2004
Connecticut Cable Resonance study for dual DC option in Middletown to Norwalk Project.
PDF (1.2Mb)
Aug 16, 2004
Connecticut Cable Resonance study for Synchronous Condenser option 2 in Middletown to Norwalk Project.
PDF (1.5Mb)
Aug 16, 2004
Analysis cites alternative configuration as marginally acceptable for upgrade to Southwest Connecticut's system.
PDF (300k)
Aug 30, 2004
Similar to Those Experienced During the January 14-16, 2004 Cold Snap Period - Letter from Mr. Richard J. Dominguez, Market Monitoring, ISO New England Inc.
PDF (306k)
Mar 24, 2004
Post Operational Assessment of New England's Interstate Pipeline Delivery Capability During the January 2004 Cold Snap - Report prepared by Levitan & Associates, Inc.
PDF (586k)
Oct 12, 2004
During the January 14-16, 2004 Cold Snap - Report prepared by ISO New England Inc., Market Monitoring Department
PDF (3.3Mb)
May 10, 2004
During the January 14-16, 2004 Cold Snap - Report prepared by ISO New England Inc., Market Monitoring Department
PDF (1.2Mb)
Oct 12, 2004
ISO New England's Management Response to the October 12, 2004 publication entitled Final Report on Electricity Supply Conditions in New England during the January 14 - 16, 2004 Cold Snap
PDF (582k)
Aug 16, 2004
The Connecticut Light and Power Company and The United Illuminating Company and ISO-NE formed a Reliability and Operating Committee.
PDF (1.3Mb)
Dec 21, 2004 PDF (258k)
Nov 01, 2004
Report prepared by ISO New England Inc., Market Monitoring Department
PDF (214k)
Feb 01, 2004
Performance of the New England and Maritimes Power Systems During the August 14, 2003 Blackout
PDF (676k)


  Copyright ©2012 ISO New England Inc.