Reliability Committee Materials
May 2, 2006
Advises ISO-NE about the design and oversight of reliability standards for New England and the development of the annual Regional System Plan issued by ISO-NE.  

Date Document Title Document Type
May 02, 2006
Includes agenda items A2 through A4.3
ZIP (6.4Mb)
May 02, 2006
Includes agenda items A4.3 through A12
ZIP (4.4Mb)
May 02, 2006
Includes motions and studies regarding Dooley, Sasco Creek and Sudbury
ZIP (4.1Mb)
May 02, 2006
Includes motions appendices regarding Bellows and Chelsea
ZIP (4.8Mb)
Mar 24, 2006
Cover letter from Steven Masse, System Planning, NSTAR to Stephen Rourke, Director, System Operations and Reliability, ISO New England regarding the addition of a 52.5 MVA, 118kV capacitor bank at Sudbury Substation
PDF (31.3k)
Apr 26, 2006
At the Sudbury Substation - Letter from Kevin Mankouski, Chair, Transmission Task Force to the NEPOOL Reliability Committee Members
DOC (179k)
Mar 24, 2006
Application from NSTAR Electric & Gas Corp for the addition of a 52.5 MVAR, 118kV Capacitor at Sudbury Substation #342 at Sudbury, Massachusetts
PDF (58.1k)
Apr 25, 2006
Letter from Jim Helton, Chair, Stability Task Force and Kevin Mankouski, Chair, Transmission Task Force to the NEPOOL Reliability Committee
DOC (186k)
Apr 14, 2006
Application from NSTAR Electric to construct a six breaker 115 kV ring bus at Chelsea Substation #488 - Includes cover letter
PDF (204k)
May 01, 2006
Letter from Jim Helton, Chair, Stability Task Force and Kevin Mankouski, Chair, Transmission Task Force to the NEPOOL Reliability Committee - Revised version
DOC (191k)
Apr 25, 2006
Letter from Jim Helton, Chair, Stability Task Force and Kevin Mankouski, Chair, Transmission Task Force to the NEPOOL Reliability Committee
DOC (184k)
Apr 12, 2006
Application from the New England Power Company for Bellows Falls Substation Revitalizaion - Includes cover letter - Revised version
PDF (413k)
Apr 26, 2006
Application from the New England Power Company for Bellows Falls Substation Revitalizaion - Includes cover letter
PDF (413k)
Apr 25, 2006
Letter from Jim Helton, Chair, Stability Task Force and Kevin Mankouski, Chair, Transmission Task Force to the NEPOOL Reliability Committee
DOC (179k)
Apr 18, 2006
Application from Northeast Utilities for Installation of a 115-kV Circuit Breaker from West Side 115kV to Dooley 115kV - Includes cover letter
PDF (283k)
Apr 26, 2006
And 115-kV Circuit Breaker at the Sasco Creek 21R Substation - Letter from Kevin Mankouski, Chair, Transmission Task Force to the NEPOOL Reliability Committee Members
DOC (180k)
Apr 18, 2006
Application from Northeast Utilities for a 115/13.8-kV Transformer & 115-kV Circuit Breaker at Sasco Creek 21R Substation - Includes cover letter
PDF (65.1k)
Apr 17, 2006
Cover letter from Jeffrey Fenn, PE, SGC Engineering for Bangor Hydro Electric Company to Don Gates, Chairman, NEPOOL Reliability Committee
DOC (40k)
Apr 14, 2006
Application from Bangor Hydro Electric Co. to Tap Line 61 from Boggy Brook in Hancock to Harrington Substation in Harrington, Maine
DOC (337k)
Apr 26, 2006
Letter from Kevin Mankouski, Chair, Transmission Task Force to the NEPOOL Reliability Committee Members
DOC (181k)
Apr 17, 2006
Cover letter from Jeffrey Fenn, PE, SGC Engineering for BHE to Don Gates, Chairman, NEPOOL Reliability Committee
DOC (39k)
Apr 06, 2006
Application from Bangor Hydro Electric Co. for Transmission from Boggy Brook in Ellsworth, Maine to Trenton Substation (New facility)
DOC (333k)
Mar 23, 2006
Cover letter from Paul Robinson, Sr. Engineer, System Planning - NSTAR to Mr. Steven Rourke, Director, System Operations and Reliability, ISO New England
DOC (47.5k)
Mar 23, 2006
Application from NSTAR Electric & Gas Corp. for Transformer and Distribution Facilities at the Needham Substation #148 in Needham, Massachusetts
DOC (565k)
Apr 13, 2006
Application from Northeast Utilities to install a new 345-kV circuit breaker at the Deerfield Substation
PDF (36.1k)


  Copyright ©2012 ISO New England Inc.