Economic Study Process Stakeholder Group Materials
Apr 18, 2008
Stakeholder forum to discuss process for implementing market efficiency transmission upgrades and economic studies
| Date |
Document Title |
Document Type |
|
| Apr 16, 2008 |
|
 |
PDF (121k) |
|
| Apr 17, 2008 |
Description of the request by MPS and CMP for the ISO to study the Maine Power Connection under Attachment N of the Tariff |
 |
PDF (185k) |
|
| Apr 17, 2008 |
Description of the draft assumptions for the study of the Maine Power Connection under Attachment N of the Tariff |
 |
PDF (925k) |
|